Control Valve Linkage - Kubota M108S Workshop Manual

Hide thumbs Also See for M108S:
Table of Contents

Advertisement

M108S, WSM

(6) Control Valve Linkage

Position and Draft Linkage
1. Remove the clevis pin (2).
2. Remove the circlips (4), (5), (6), (7).
3. Remove the stopper and draw out the rod (3).
4. Remove the stopper and draw out the rod (8). To remove the O-
ring (22) and (23) order by c → b → a as shown in figure.
5. Remove the cotter pin (21).
6. Take out the linkage.
7. Remove the bracket guide assembly (20).
(When reassembling)
• When install the rods, noting O-ring.
• Apply transmission fluid to the O-ring.
• When installing the rod (8), a → b → c let the fix position of O-
ring (22) go to the outside of the hydraulic cylinder body (25) with
the process alternately, and O-ring (24) is assembled into the
rod. (As shown in figure.)
• When assemble the position connector (10) notched section (18)
downward.
Bracket guide mounting
Tightening torque
screw
(1) Clevis Pin
(2) Clevis Pin
(3) Rod
(4) Circlip
(5) Circlip
(6) Circlip
(7) Circlip
(8) Rod
(9) Spool Retainer
(10) Position Connector
(11) Draft Link 1
(12) Draft Link 2
(13) Position Balancer
8-S16
HYDRAULIC SYSTEM
24 to 27 N·m
2.4 to 2.8 kgf·m
18 to 20 lbf·ft
(14) Draft Cam
(15) Connector
(16) Feed Back Link
(17) Holder Assembly
(18) Notched Section
(19) Screw
(20) Bracket Guide Assembly
(21) Cotter Pin
(22) O-ring
(23) Chamfer
(24) O-ring
(25) Hydraulic Cylinder Body
(26) Stopper
W1042606
KiSC issued 06, 2007 A

Advertisement

Table of Contents
loading

Table of Contents