Main Switch - Kubota M108S Workshop Manual

Hide thumbs Also See for M108S:
Table of Contents

Advertisement

M108S, WSM

[2] MAIN SWITCH

(1) Main Switch
Preparation
1. Remove the meter panel and the main switch connectors after
turning the main switch off.
2. Perform the following checking.
(1) Main Switch
Connector Voltage
1. Measure the voltage across the connector B terminal and
chassis.
2. If the voltage differs from the battery voltage (11 to 14 V), the
wiring harness is faulty.
Connector B terminal
Voltage
– Chassis
A : Wire Harness Side Connector 6G
Main Switch at ACC Position
1. Turn the main switch ACC position.
2. Measure the resistance across the B terminal and the ACC
terminal.
3. If 0 ohm is not indicated, renew the main switch.
B terminal –
Resistance
ACC terminal
A : Main Switch Side Connector 6G
Main Switch at Key ON Position
1. Turn and hold the main switch at the ON position.
2. Measure the resistances across the B terminal and the ACC
terminal, across B terminal and IG1 terminal and B terminal and
IG2 terminal.
3. If 0 ohm is not indicated, renew the main switch.
B terminal –
ACC terminal
B terminal –
Resistance
IG1 terminal
B terminal –
IG2 terminal
A : Main Switch Side Connector 6G
9-S13
ELECTRICAL SYSTEM
W1016075
Approx. battery voltage
W1014732
0 Ω
W1014824
0 Ω
0 Ω
0 Ω
W1014641
KiSC issued 06, 2007 A

Advertisement

Table of Contents
loading

Table of Contents