Operating Guide | VLT® AutomationDrive FC 302
7 Plastic cable entry plate (installed)
9 Keyhole opening
Illustration 15:
Assembling the Cable Entry Plate and Terminal Cover

4.10.3 Installing Load share/Regen Terminals to an E3h/E4h

Context:
The load share/regen terminals, on the top of the drive, are not installed from the factory to prevent damage during shipping.
Procedure
1. Remove the terminal plate, 2 terminals, label, and fasteners from the accessory bag included with the drive.
2. Remove the cover from the load share/ regen opening on the top of the drive. Put aside the 2 M5 fasteners for reuse later.
3. Remove the plastic backing and install the terminal plate over the load share/regen opening. Secure with the 2 M5 fasteners and
torque to 2.3 Nm (20 in-lb).
4. Install both the terminals to the terminal plate using 1 M10 fastener per terminal. Torque to 19 Nm (169 in-lb).
5. Install the label on the front of the terminals as shown in
Example:
1
2
3
4
5
1 Label fastener, M4
3 Load share/regen terminal
5 Terminal plate with 2 openings
Illustration 16:
Load share/Regen Terminals
34 | Danfoss A/S © 2019.12
8 Fastener point
illustration
16. Secure with 2 M4 screws and torque to 1.2 Nm (10 in-lb).
2 Label
4 Terminal fastener, M10
Mechanical Installation
AQ275652476278en-000101 / 130R0709