Guide for Raised-Floor Preparation

A raised floor is not required for the Eserver pSeries 670 (except in Canada). However, it is
recommended for optimum system cooling and cable management. Raised floor cutouts should be
protected by electrically nonconductive molding, appropriately sized, with edges treated to prevent cable
damage and to prevent casters from rolling into the floor cutouts.
Front-service access is necessary on the Eserver pSeries 670 to accommodate a lift tool for the
servicing of large drawers (the managed server, IO drawer, and media subsystems). Front and rear service
access is necessary to accommodate the lift tool for servicing of the optional integrated battery feature
(IBF).
IBF
Lift Tool Service
Clearance
Cutting and Placement of Floor Panels
This section provides recommendations for making the necessary openings in the raised floor for installing
the Eserver pSeries 670.
Note: The following illustration is intended only to show relative positions and accurate dimensions of floor
cutouts. The illustration is not intended to be a machine template and is not drawn to scale.
The x-y alphanumeric grid positions are used to identify relative positions of cutout floor panels that may
be cut in advance.
1. Measure the panel size of the raised floor.
2. Verify the floor panel size. The floor panel size illustrated is 600 mm (23.6 in.) and 610 mm (24 in.)
panels.
3. Ensure adequate floor space is available to place the frames over the floor panels exactly as shown in
the illustration. Refer to "Considerations for Multiple System Installations" on page 155 for front-to-back
and side-to-side clearances. Use the plan view if necessary. Consider all obstructions above and below
the floor.
4. Identify the panels needed, and list the total quantity of each panel required for the installation.
5. Cut the required quantity of panels. When cutting the panels, you must adjust the size of the cut for
the thickness of the edge molding you are using. The dimensions shown in the illustrations are finished
dimensions. For ease of installation, number each panel as it is cut, as shown in the following
illustrations.
Note: Depending on the panel type, additional panel support (pedestals) may be required to restore
structural integrity of the panel. Consult the panel manufacturer to insure that the panel can
144
Site and Hardware Planning Information
Airflow Direction
Top View
Floor Plan Considerations for Single Units
Drawer Subsystems:
!
Managed Server: ~39" deep
!
I/O: ~34" deep
Lift Tool Service
Clearance

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

7006 42tEserver pseries7006 42w7007 powerportable n407008 powerstation m207008 powerstation m2a ... Show all

Table of Contents