decon E-Drive PLUS Service Manual page 55

Hide thumbs Also See for E-Drive PLUS:
Table of Contents

Advertisement

2
Route the lead wires and secure them with
clamps. Route the lead wires with enough
slack so that they will not be pulled when
the frame is folded. (Refer to "(4) Wire
Routing" in 3.4.)
3
Bundle the excess lead wires and store
them in the battery box. Install the cover.
Plate cover bolt tightening torque:
1.5 to 2.5 Nm
5.8.2. Swing Out Bracket
1
Remove the clamps that are securing the
lead wires from the controller to the battery
seat.
2
Remove the plate cover on the battery
seat.
3
Pull out the lead wires stored in the battery
box, cut the clamp, and disconnect the
connector from the circuit board.
4
Remove the bolt securing the slider to the
holder, and remove the slider with the con-
troller.
Tightening torque: 1.1 to 1.4 Nm
Tightening torque: 14 to 16 Nm
Tightening torque: 5 to 8 Nm
5
55

Advertisement

Table of Contents
loading

Table of Contents