Power Supply Removal And Replacement - Oracle Acme Packet 6100 Hardware Installation Manual

Table of Contents

Advertisement

Locking Clip Latch

Power Supply Removal and Replacement

66
6.
When mounted in slide rails, the chassis will stop when the locking clip pin
on the chassis slide rail engages with the equipment rack slide rail.
Figure 6 - 88. Locking Clip Fastens the Chassis and Rack Slide Rails
7.
Push on the locking clip pin and locking clip latch to unlock the slide rails
from each other.
Figure 6 - 89. Locking Clip Latch and Locking Clip Pin
8.
Remove the chassis completely from the slide rails.
9.
Lift the Acme Packet 6100 out of the equipment rack, and move it to an ESD
safe location.
This section explains how to remove and replace the power supplies in the
Acme Packet 6100 chassis.
The power supply is a user-replaceable component. If a Acme Packet 6100
power supply malfunctions, you should remove the malfunctioning power
supply and replace it. The power supply can be removed from the chassis
while still installed in the rack and while the second power supply is providing
system power; this is called a warm swap. When removing and replacing a
Locking Clip Pin
Acme Packet 6100 Hardware Installation Guide

Advertisement

Table of Contents
loading

Table of Contents