5. Save your settings (copy RAM to ROM).
6. Switch off the inverter supply voltage.
7. Wait until all LEDs on the inverter go dark.
8. Switch on the inverter supply voltage again.
The inverter has taken the settings from the STARTER project.
Safety Integrated - SINAMICS G110M, G120, G120C, G120D and SIMATIC ET 200pro FC-2
Function Manual, 01/2017, FW V4.7 SP6, A5E34261271B AD
5.15 Offline commissioning using STARTER
Commissioning
207