5 Initial commissioning

Preparatory work for initial commissioning

Ethernet connection with
the controller
Behavior after power-up
Status of the LEDs
126
The JC-120MC in delivered condition has got IP address 192.168.1.1.
Configure the Ethernet interface of your PC so that it communicates with the
controller via this IP address.
If the mode selector is in position STOP when the controller is powered-up,
the application program will not be launched.
Following a correct commissioning, the LEDs are lit as follows:
R
E D1 D2
SD
U1
U2
U3
U4
LED
State
R
1Hz
E
OFF
D1
OFF
D2
OFF
SD
OFF
U1 - U4
OFF
Jetter
Description
Logic voltage supply is OK; application program has been
stopped.
No error
No error
No error
The controller does not access the SD card.
LEDs which are programmed depending on the
application