Figure 46. Marking the Locations of the Bracket Holes on a Concrete Wall
4. Use a drill and a 1/4-inch carbide drill bit to pre-drill the holes you
marked in step 3. Please review the following guidelines:
Prior to drilling, set the drill to hammer and rotation mode. The
modes break up the concrete and clean out the hole.
Clean out the holes with a brush or compressed air.
5. Insert the anchors into the holes.
6. Have another person hold the device at the selected wall location
while you secure it to the wall with the M4x32mm screws provided.
Refer to Figure 47 on page 89.