3. Commissioning
3.4
Commissioning with various drives/measuring systems
3.4.1 Digital measuring system (DGCI, DDLI)
3.4.2 Encoder (DNCI, DDPC)
Festo P.BE-CPX-CMIX-EN en 1208a
Immediately after switch-on, the measuring system provides
the position value. Commissioning is not necessary.
If needed, the current position can be set as zero point with
the bit REF = 1 in the control byte CCON. Confirmation takes
place via ACK = 1 in the status byte SCON. Negative values
are output below the zero point, positive values above it.
If a zero point is established, it remains stored even after
switching on or off.
The incremental measuring system must be referenced after
switch-on.
The current position is accepted as zero point (reference
point) with setting of the bit REF in the control byte CCON.
Confirmation takes place via the bits ACK = 1 and REF_OK = 0
in the status byte SCON. Negative values are output below
the zero point, positive values above it.
3-11