3. Commissioning
3.1

Overview / procedure for commissioning

Festo P.BE-CPX-CMIX-EN en 1208a
The following steps must be performed during
commissioning:
1. Check set-up of the used components on the axis string,
if necessary.
2. Check power supply of the CPX terminal; switch on power
supply.
3. Configure CPX node.
4. Depending on the drive or measuring system used:
Digital measuring system (e.g. DGCI, DDLI)
No commissioning necessary. A zero point can
optionally be set.
Encoder (e.g. DNCI):
The incremental measuring system must be
referenced after switch-on.
Potentiometer (e.g. MLO-POT-..., DSMI, DNCM):
The min. and max. position value must be set once
and the effective stroke length (max. measurement
length) written in 1/100 mm.
After commissioning:
5. Check function of the CMIX.