ABB ACH550-UH User Manual page 27

Ach550 series, hvac drives (1...550 hp), e-clipse bypass drives (1...400 hp), packaged drives with disconnect (1...550 hp)
Hide thumbs Also See for ACH550-UH:
Table of Contents

Advertisement

ACH550-UH User's Manual
The locations of screws EM1 and EM3 are shown in the diagram on page 1-20. The
locations of screws F1 and F2 are shown in the diagram on page 1-21.
Frame
sizes
R1...R3
R4
R5...R6
x = Use the provided metal screw which may already be installed. (EMC filter(s) will be connected.)
= Use the installed polyamide screw. (EMC output filter will be disconnected.)
– = Remove the installed metal screw. (EMC filter(s) will be disconnected.)
Install the wiring
Checking motor and motor cable insulation
WARNING! Check the motor and motor cable insulation before connecting the drive
to input power. For this test, make sure that motor cables are NOT connected to the
drive.
1. Complete motor cable connections to the motor, but NOT to the drive output
terminals (U2, V2, W2).
2. At the drive end of the motor cable, measure the insulation
resistance between each motor cable phase and Protective
Earth (PE): Apply a voltage of 1 kV DC and verify that
resistance is greater than 1 Mohm.
Symmetrically
Screw
grounded TN systems
(TN-S systems)
EM1
x
EM3
x
EM1
x
EM3
x
F1
x
F2
x
IT systems (ungrounded
Corner grounded
or high-resistance-
TN systems
grounded [> 30 ohm])
x
x
x
x
ohm
1-23
M
PE
Installation

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents