Installation position
802-9074.9 • INSTALLATION AND OPERATING INSTRUCTIONS • NXPLUS C Wind • Revision 05
Pre-assemble the coach bolts on the first arcing plate. To do this, turn the fixing nut so far
that the bolt heads can still be fitted into the mounting plate later.
Hang the arcing plate into the mounting plate and push into the correct position.
Push rubber sleeves onto cable T-plugs.
Mount second set of cable T-plugs on phases L1 to L3.
Mount the floor plate of the pressure-resistant floor cover (see page 97, "Mounting the
pressure-resistant floor cover").
Pre-assemble the coach bolts on the second arcing plate. To do this, turn the fixing nut so
far that the bolt heads can still be fitted into the mounting plate later.
Hang the arcing plate into the mounting plate and push into the correct position.
Tighten the fixing nuts of the arcing plate. Tightening torque: 20 Nm.
Push rubber sleeves onto cable T-plugs.
Mount third set of cable T-plugs on phases L1 to L3.
Mount the floor plate of the pressure-resistant floor cover (see page 97, "Mounting the
pressure-resistant floor cover").
Mount the third arcing plate in the same way as the second one.
15.3
Cable connection with cable-type current transformers
Cable-type current transformers in the disconnector panel / ring-main panel
The transformer mounting plate is pre-assembled on the cable bracket at the factory. The
cable-type current transformers are supplied in the cable compartment and must be mounted
on the high-voltage cables on site.
Fig. 95:
Installation position of cable-type current
transformers in the disconnector panel /
ring-main panel.
Installation
Cable plug
Cable shield
Transformer mounting plate
Cable-type current
transformer
Cable clamp