Siemens NXPLUS C Installation And Operating Instructions Manual page 170

Medium-voltage switchgear/wind fixed mounted circuit-breaker switchgear up to 36 kv, extendable
Table of Contents

Advertisement

Final work..................................................................... 118
Fixing material................................................................ 60
Fixing on wooden pallets for delivery .............................. 64
Floor cover, pressure-resistant ........................................ 93
Floor openings, fixing points ........................................... 49
Floor, construction.......................................................... 48
Floor, load-bearing capacity ............................................ 47
Foundation, fastening the switchgear to ......................... 72
Function test ................................................................ 120
Function test, electrical ................................................. 123
Function test, mechanical ............................................. 120
G
Gas quality, checking .................................................... 168
H
High voltage, applying .................................................. 127
High-voltage test, power consumption per panel............. 36
I
Indications and their meanings ..................................... 131
Indicators ..................................................................... 129
Information to Siemens before delivery ........................... 59
Installation ..................................................................... 47
Installation material ........................................................ 60
Installation, auxiliary means............................................ 60
Installation, earthing busbar ........................................... 88
Installation, low-voltage compartments........................... 90
Installation, preparing..................................................... 59
Installation, switchgear termination ................................ 91
Installation, tools ............................................................ 60
Installation, voltage transformer ..................................... 80
Installing the transport units ........................................... 67
Interlocks........................................................................ 26
Internal arc classification................................................. 38
Interrogation lever ........................................................ 136
IP31D ........................................................................... 114
J
Joining, panels................................................................ 70
L
Locking devices....................................................... 26, 129
Low-voltage compartments, installation.......................... 90
M
Maintenance ................................................................ 168
Motor operating mechanism ......................................... 145
Motor operating mechanism of three-position switch,
fuse protection table ...................................................... 44
Motor operating mechanism, protection table ................ 43
170/172
Revision 05 • INSTALLATION AND OPERATING INSTRUCTIONS • NXPLUS C Wind • 802-9074.9
O
Opening the switch-disconnector .................................. 145
Operating levers, three-position switch-disconnector..... 145
Operating mechanisms, three-position disconnector .......16
Operating mechanisms, three-position
switch-disconnector........................................................ 18
Operating the three-position switch-disconnector ......... 145
Operating times ..............................................................41
Operation ..................................................................... 129
P
Packing and transport unit ..............................................62
Panel versions................................................................. 11
Panels, aligning ..............................................................69
Panels, bolting together ..................................................69
Panels, joining ................................................................70
Partition class ................................................................. 38
Personal protective equipment (PPE) ................................. 6
Personnel, instructing ................................................... 120
Phase sequence, busbar compartment ............................37
Phase sequence, cable compartment............................... 37
Position indicators......................................................... 129
Power loss ...................................................................... 36
Power-frequency voltage test on site............................. 126
Pressure-resistant floor cover .......................................... 93
Primary injection test .................................................... 127
Pushbutton, readjusting the freewheel.......................... 120
Q
Qualified personnel...........................................................7
R
Rating plates................................................................... 40
Ready-for-service indicator ..............................................25
Ready-for-service indicator, checking .............. 67, 132, 145
Recycling ........................................................................ 46
S
Safety instructions ............................................................ 5
Screened/unscreened busbars .........................................72
Screw inserts, busbars..................................................... 72
Seaworthy crate, preparing storage................................. 59
Secondary wiring, connection ....................................... 109
Seismic withstand capability ................................. 9, 40, 50
Service instructions....................................................... 168
Short instructions ......................................................... 156
Short-circuit/earth-fault indicator .................................... 31
Signal terms and definitions.............................................. 5
Standards, electromagnetic compatibility, EMC ............... 39
Stoppers, busbars ...........................................................72

Advertisement

Table of Contents
loading

Table of Contents