Siemens NXPLUS C Installation And Operating Instructions Manual page 119

Medium-voltage switchgear/wind fixed mounted circuit-breaker switchgear up to 36 kv, extendable
Table of Contents

Advertisement

Closing the cable
comparment cover
Checking auxiliary cable
connections
Checking high-voltage
connections
Feeder without cables
Tyding up and visual
inspection
802-9074.9 • INSTALLATION AND OPERATING INSTRUCTIONS • NXPLUS C Wind • Revision 05
Fig. 113: Earthing the front cover using Torx screw with
cutting ring
Mount and bolt together cable compartment cover competently, see page 99, "Connecting
cable T-plugs".
ATTENTION!
Earthing of the cable compartment cover is only guaranteed if the cover is bolted together with
the switchgear frame. Do always use the self-tapping screws supplied to achieve a safe
earthing of the cable compartment cover.
Before commissioning, bolt the cable compartment cover together with the switchgear
frame.
Check correct wiring according to the circuit diagrams.
Check clamping and plug-in connections at random (perfect contact, labels, etc.).
Check earthing of cable terminations on all connected high-voltage cables.
If required, test cables (see page 166, "Cable testing").
Switch the switching device to EARTHED position and lock it, or cover the bushings with
surge-proof caps.
Remove any attached instruction labels and documents that are not required anymore for
operation.
Remove any tools, materials etc. that are not required anymore from the area of switchgear.
Remove any dirt from the area of the switchgear (cleaning agent ARAL 4005 or HAKU 1025
and lint-free rag/brush).
Fit all covers.
Put the caps on the test sockets of the capacitive voltage detecting systems.
Touch up scratches and impacts in the surface painting. Available kit: Touch-up set (spatula
and paint) and paint pen.
Installation
Torx screw with cutting ring
119/172

Advertisement

Table of Contents
loading

Table of Contents