Siemens NXPLUS C Installation And Operating Instructions Manual page 56

Medium-voltage switchgear/wind fixed mounted circuit-breaker switchgear up to 36 kv, extendable
Table of Contents

Advertisement

Installation
Fig. 41:
Floor fixing plate
Stipulations for evenness
and straightness
56/172
Fixing plate
NOTE!
The welded seams are susceptible to corrosion.
Galvanize the welded seams after welding.
Please observe the following items when preparing the foundation:
• A suitable foundation can be a false floor, a double floor or a reinforced-concrete
foundation. The reinforced-concrete floor must be equipped with foundation rails for
supporting the panels.
• As for design and construction of the foundation, the relevant standards DIN 43 661
"Fundamentschienen in Innenanlagen der Elektrotechnik" (Foundation rails in electrical
indoor installations) and DIN 18 202 "Maßtoleranzen im Hochbau" (Blatt 3) (Measuring
tolerances in structural engineering (Sheet 3)) apply.
• Dimensions of the floor opening and the fixing points of the switchgear frame (see page 49,
"Floor openings and fixing points" and see page 72, "Fastening the switchgear to the
foundation").
• Determine level differences between the installation surfaces of the panels using a
measuring sheet, and compensate them with shims (0.5 - 1.0 mm).
Revision 05 • INSTALLATION AND OPERATING INSTRUCTIONS • NXPLUS C Wind • 802-9074.9
±2
60
mm
±2
50
mm
Plate 30 x 5 x 40 mm, DIN 1017/EN 10025,
S235 JR, hot-dip galvanized
±1
40
mm
±2
35
mm
±1.5
80
mm
±1
30
mm
Plate 80 x 5 x 145 (160) mm, DIN 1017/
EN 10025, S235 JR, hot-dip galvanized
±2
145
mm
30 mm
13 mm