802-9074.9 • INSTALLATION AND OPERATING INSTRUCTIONS • NXPLUS C Wind • Revision 05
Earth the feeder (see page 138, "Earthing/ready-to-earth with the three-position switch").
Secure against reclosing.
Verify safe isolation from supply (see page 152, "Verification of safe isolation from supply").
Undo the fixing screws of the cable compartment cover.
Remove the cable compartment cover.
Remove the screw insert of the connected cable T-plug according to the manufacturer's
instructions.
Insert / screw the test adapter in the cable T-plug.
Connect test lead.
Short-circuit and earth the capacitive test sockets at the LRM, VOIS, WEGA or CAPDIS system.
De-earth the feeder (see page 138, "De-earthing with the three-position switch").
Perform voltage test.
Proceed in reverse order to return to the initial situation.
Operation
167/172