802-9074.9 • INSTALLATION AND OPERATING INSTRUCTIONS • NXPLUS C Wind • Revision 05
Ring-main panel: De-earthing the feeder
Initial situation
Push the control gate downwards.
Remove the operating lever (the control gate
returns to its initial position).
Remove the padlock.
Switch earthing switch to OPEN position (insert
the operating lever and turn approx. 55°
counter-clockwise).
Operation
165/172