DANGER!
Danger in case of maloperation! The following short instructions give an overview of the
operating procedures.
Perform the switching operations as described (see page 133, "Operating the circuit-
breaker") and observe the warnings given there.
The operating levers for the three-position switches with/without adapter are coded and
identified by color:
Operating levers for three-position disconnector
Fig. 143: Operating lever for DISCONNECTING
function
Fig. 145: Socket of operating lever,
DISCONNECTING
To operate the three-position switch-disconnector, one of the two adapters is pushed onto the
operating lever for the DISCONNECTING function of the three-position disconnector.
The function of the two adapters is marked respective symbols.
Operating lever for three-position switch-disconnector
Fig. 147: Operating lever with adapter
Revision 05 • INSTALLATION AND OPERATING INSTRUCTIONS • NXPLUS C Wind • 802-9074.9
Fig. 144: Operating lever for EARTHING/
READY-TO-EARTH function (handle
painted red)
Fig. 146: Socket of operating lever,
EARTHING/READY TO EARTH
Fig. 148: Operating lever
Fig. 149: Adapter for DISCONNECTING
function with DISCONNECTING
symbol (see arrow)
Fig. 150: Adapter for EARTHING function
with EARTHING symbol (see arrow)