Siemens NXPLUS C Installation And Operating Instructions Manual page 158

Medium-voltage switchgear/wind fixed mounted circuit-breaker switchgear up to 36 kv, extendable
Table of Contents

Advertisement

Operation
Initial situation
Switch the three-position disconnector to
READY-TO-EARTH position (insert the operating
lever and turn 180° clockwise).
Push the locking device upwards.
158/172
Circuit-breaker panel: Feeder earthing
Push the interrogation lever downwards.
Remove the operating lever (the interrogation
lever and the control gate return to their initial
position).
Fit a padlock.
Revision 05 • INSTALLATION AND OPERATING INSTRUCTIONS • NXPLUS C Wind • 802-9074.9
Push the control gate to the right.
Close the circuit-breaker to earth the feeder.