Monitoring Phase - HEIDENHAIN TNC 640 User Manual

Hide thumbs Also See for TNC 640:
Table of Contents

Advertisement

18

Monitoring phase

Cycle run: Monitoring phase
1 The camera will be mounted by the machine tool builder onto
the main spindle. The main spindle moves to a position defined
by the machine tool builder.
2 After the TNC has reached this position, it will automatically
open the camera lid.
3 The TNC will generate an image of the current condition.
4 There is then an image comparison between the mean
image and the variance image (for more information, See
"Fundamentals", page 656).
5 Depending on whether the TNC detects an "error" (deviation),
the TNC can now force a program cancellation (for for further
information, See "Fundamentals", page 656). If parameter
Q309=1 is set, the TNC will display the image on the screen
upon detecting an error. If parameter Q309=0 is set, no image
will be displayed on the screen and the program will not be
stopped.
6 To complete the operation the TNC will close the camera lid.
670
Visual Setup Control VSC (Software Option 136) | Workspace Global (Cycle 600)
HEIDENHAIN | User's manual for cycle programming | 10/2017

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tnc 640 e

Table of Contents