d. One Time Only
e. Every Hour or Every X seconds. No additional information is required for this option.
4) Once you have selected the schedule options for the task click "Next" to continue to the final page.
5) To complete the setup of the new task click on the "Finished" button. The new task will now appear in the
task list and will immediately become active.
Modify a Scheduled Task
Created scheduled tasks can be modified. You can modify the shortcut to run, the schedule, or the specifics of a
particular task. To modify a task double click on the desired entry or click once and select properties from the option
at the top of the window.
This will start the same wizard you used to create the task. Follow the same procedure to change any of the option or
click cancel at any time to return to the task scheduler window.
Remove a Scheduled Task
For scheduled tasks that are no longer needed, you can remove them entirely by selecting the corresponding row and
clicking on the delete button at the top of the window.
Temporarily Turn Off a Scheduled Task(s)
You can temporarily turn off or pause scheduled tasks from running using the pause button provided. The status field
will show paused tasks. To turn a task back on simply slick on the pause button again.
In the special shortcuts (System Properties) you can assign a shortcut to toggle the pause state of all schedule tasks.
NEO Lighting Control Console
Scheduled Tasks
77
Need help?
Do you have a question about the NEO and is the answer not in the manual?