Mitsubishi Electric NZ2EX2B-60AD4 User Manual page 63

Cc-link ie field network analog-digital converter module
Table of Contents

Advertisement

● The time taken for the LINK LED to turn on after connection of the cable may vary. The LINK LED normally turns on in a
few second. However, if link-up processing is repeated due to a condition of a device on the line, the longer time may be
required. If the LINK LED does not turn on, refer to the following and take a corrective action.
Page 183, Section 11.4.1 (8)
● PORT1 connector and PORT2 connector need not to be distinguished. When only one connector is used in star topology,
either PORT1 connector or PORT2 connector can be used.
● When two connectors are used in line topology or ring topology, there is no restriction on the connection combination of
PORT1 connector and PORT 2 connector. For example, the connection from PORT1 to PORT1 and the connection from
PORT1 to PORT2 are both possible.
Connection from port 1 to port 1,
and from port 2 to port 2
(b) Disconnecting
CHAPTER 6 INSTALLATION AND WIRING
Both can be used.
Connection from
port 1 to port 2
1.
Power off the module.
2.
With the latch of the Ethernet cable pressed, unplug
the cable.
6
61

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nz2gf2bn-60ad4

Table of Contents