Cable Installation Inspection PFG-690 AP0802028 and Earlier
Inspect to make sure the lid cables are installed in the correct hole in the cable mounting bracket (figure
3). The cables should be installed only in the hole closest to the front of the fryer (figures 1&2). If
either cable is installed in the hole that is closest to the rear of the fryer, the fryer would need to be taken
out of service until both cables are replaced.
Correct
Do Not Use
Figure 1.
Left cable
as viewed from the
rear of the fryer. Cable installed in the
correct hole.
Correct
Do Not Use
Figure 2.
Right cable
rear of the fryer. Cable installed in the
correct hole.
1219 US 35 West P.O. Box 60 Eaton, OH 45320 (937)456-8400 Fax (937)456-8402 www.hennypenny.com
as viewed from the
Figure 3. Cable Mounting Bracket
Figure 4. Rear of Fryer