User Manual - Rev AJ
9.4.6.1 DIPS AND INTERRUPTIONS TEST
Scroll to the DIPS AND INTERRUPTIONS entry using the up and down cursor keys. Press the
ENTER key to select the DIPS AND INTERRUPTIONS menu. The screen will appear as shown
in Figure
9-15.
STATE
This field enables or disables the -411 test mode.
EOS ST
ATE
This field is not available on MX Series systems.
RUN AL
L
The RUN ALL selection will cause the following automated test sequence sugg
standard to be run:
Step
Output in
% of U
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
Table 9-19: Dips and Interruptions Tests Performed During RUN ALL
The user can change the NOMINAL Ut voltage for this. The RUN ALL Command line will change
to ABORT during the test. Selecting ABORT and pressing the ENTER key will terminate the test
at any time and the output voltage will return to the nominal value.
PHASE SELECTION
208
Figure 9-15: IEC Dips and Interrupts
No of Cycles
T
0
0.5
0
0.5
0
1
0
5
0
10
0
25
0
50
40
0.5
40
0.5
40
1
40
5
40
10
40
25
40
50
70
0.5
70
0.5
70
1
70
5
70
10
70
25
70
50
Start angle
Repeat #
(Degrees)
0
180
0,45,90
3 at diff ø
45,90,135
3 at diff ø
90,135,180
3 at diff ø
180,225,270
3 at diff ø
270,315,0
3 at diff ø
0
180
0,45,90
3 at diff ø
45,90,135
3 at diff ø
90,135,180
3 at diff ø
180,225,270
3 at diff ø
270,315,0
3 at diff ø
0
180
0,45,90
3 at diff ø
45,90,135
3 at diff ø
90,135,180
3 at diff ø
180,225,270
3 at diff ø
270,315,0
3 at diff ø
California Instruments
ested by the
Delay
times
between
repeats (s)
3
10
3
10
10
10
10
10
10
3
10
3
10
10
10
10
10
10
3
10
3
10
10
10
10
10
10
MX Series