Preparing for Installation
Site Requirement Guidelines
You must terminate DC power cables using cable lugs at the power shelf
end.Ensure the lugs are dual-hole and that they fit over M6 terminal studs at
0.625-inch (15.88-mm) centers (for example, Panduit Part Number LCD8-14A-L
or equivalent).
Figure 2-9
shows the type of lug required for DC-input cable connections.
Figure 2-9
DC Power Cable Lug
All measurements in inches
2.24
End View
Ø 0.267
0.48
2 holes
Crimp area
0.25
0.63
0.37
0.08
Figure 2-10
shows a typical source DC power distribution scheme for a 2400 W
DC PDU.