Cisco 12410 Installation And Configuration Manual page 307

Hide thumbs Also See for 12410:
Table of Contents

Advertisement

Chapter 7
Maintaining the Router
Step 2
Caution
Figure 7-14 Installing the Blower Module
OL-11496-01
Install the new blower module into the chassis
Lift the blower module (with two hands) and slide it halfway into the module
a.
bay.
Slowly push the blower module into the chassis until it mates with the
b.
backplane connector at the back of the module bay.
To prevent damage to the connectors, do not use excessive force when inserting
the blower module into the chassis.
Tighten the captive screws on the blower module to secure it to the chassis.
c.
The (green) OK status indicator on the front of the blower module goes on. If
the OK indicator does not light, see the
Installation" section on page
Cisco 12010, Cisco 12410, and Cisco 12810 Router Installation and Configuration Guide
Removing and Replacing the Blower Module
(Figure
7-14):
"Troubleshooting the Blower Module
7-26.
7-25

Advertisement

Table of Contents
loading

This manual is also suitable for:

1281012010

Table of Contents