Cisco 12410 Installation And Configuration Manual page 238

Hide thumbs Also See for 12410:
Table of Contents

Advertisement

Troubleshooting the Power Subsystem
Figure 5-1
1
4
1
2
Use the following procedure to troubleshoot the AC power supply if it is not
operating properly.
Make sure the power supply is seated properly.
Step 1
Cisco 12010, Cisco 12410, and Cisco 12810 Router Installation and Configuration Guide
5-6
AC PEM Components
PW R OK
FA UL T
TE M P
IL IM
PWR OK
FAUL T
TEMP
ILIM
Status indicators 3
Handle
4
Eject and reseat the PEM. Check that:
The captive screw on the ejector lever is tightened securely.
The power switch is set to the on (1) position.
Chapter 5
3
2
0
Ejector lever
Power On/Off switch (shown in the ON/1 position)
Troubleshooting the Installation
OL-11496-01

Advertisement

Table of Contents
loading

This manual is also suitable for:

1281012010

Table of Contents