ABB REO 517 Applications Manual page 172

Multi-function terminals for railway application
Table of Contents

Advertisement



162
Synchro-check and energising-check
(SYRW)
6\QFKURFKHFN DQG HQHUJLVLQJFKHFN 6<5:
$SSOLFDWLRQ
6\QFKURFKHFN JHQHUDO
The synchrocheck function is used for controlled closing of a circuit in an interconnect-
ed network. When used, the function gives an enable signal at satisfied voltage condi-
tions across the breaker to be closed. When there is a parallel circuit established, the
frequency is normally the same at the two sides of the open breaker. At power swings,
e.g. after a line fault, an oscillating difference can appear. Across the open breaker,
there can be a phase angle and a voltage amplitude difference due to voltage drop across
the parallel circuit or circuits. The synchro-check function measures the difference be-
tween the U-line and the U-bus, regarding voltage (UDiff), phase angle (PhaseDiff),
and frequency (FreqDiff). It operates and permits closing of the circuit breaker when
the following conditions are simultaneously fulfilled:
The voltages U-line and U-bus are higher than the set value for UHigh of the base
voltage U1b.
The differences in the voltage and phase angles are smaller than the set values of
UDiff and PhaseDiff.
The difference in frequency is less than the set value of FreqDiff. The bus frequency
must also be within a range of +/- 10 % of the rated frequency.
1RWH
3KDVHSKDVH YROWDJH  9 RU  9 FDQ QRW EH FRQQHFWHG GLUHFWO\ WR DQ LQGLYLGXDO
LQSXW YROWDJH WUDQVIRUPHU 7KH LQGLYLGXDO WUDQVIRUPHU LV GHVLJQHG IRU SKDVHQHXWUDO
YROWDJH 8
 9 RU 8
U
The function can be used as a condition to be fulfilled before the breaker is closed at
manual closing and/or together with the auto-recloser function.
 9 
U
&KDSWHU 
&RQWURO

Advertisement

Table of Contents
loading

Table of Contents