ABB REO 517 Applications Manual page 156

Multi-function terminals for railway application
Table of Contents

Advertisement


146
Sudden voltage change function (SVC)
SVC-BLOCK
>1
SVC-VTSU
t
UL1
du
dt
)LJXUH  6LPSOLILHG ORJLF GLDJUDP IRU WKH VXGGHQ YROWDJH FKDQJH IXQFWLRQ
7ULS ORJLF
The output signal SVC-START and the start signal ZnRW-START from the impedance
function should be configured to an AND-gate for the release of the trip signal to the
line circuit-breaker. An example of the tripping logic for the impedance protection and
the functions SVC and SCC (Sudden Change Current function) is shown in figure 65.
Z n R W -
S T A R T
S V C -
S T A R T
S C C - S T A R T
)LJXUH  ([DPSOH RI WKH WULSSLQJ ORJLF IRU WKH LPSHGDQFH SURWHFWLRQ DQG WKH IXQF
WLRQV 69& DQG 6&&
&DOFXODWLRQV
The parameters for the sudden voltage change function are set via the local HMI or PST
(Parameter Setting Tool). Refer to the Technical reference manual for setting parame-
ters and path in local HMI.
The setting of the operate value for the step voltage measuring element du/dt must be
greater than the highest expected voltage drop due to load change on the protected line.
An additional margin of at least 10% in addition to the declared inaccuracy of the volt-
age transformers and the measuring element should be allowed for in the setting.
&
t
&
> 1
e n 0 2 0 0 0 5 1 2 . v s d
&KDSWHU 
SVC-START
en02000539.vsd
9ROWDJH