Thermo Scientific dionex ic pure water Operating Instructions Manual page 93

Table of Contents

Advertisement

Step
Action
1
a. Switch the system off. If the external 20 L tank with level
b. Remove the ultrapure cartridge. (see "Changing the ultrapure
2
a. Click in the adapter for disinfection into the both quick-
Note If you are using an optional pretreatment cartridge, the
tube jumper will be required for the pretreatment cartridge. This
jumper was removed in the section 'Connection of a
Pretreatment cartridge' for later use.(see " Installation" on
page 21).
b. Of the three pretreatment connections on the unit, fit the right
Thermo Scientific
control is connected to a feedwater supply source, close off
the feedwater supply.
cartridge" on page 79). If an optional pretreatment cartridge
is installed, remove this too (see "Replacing the pretreament
cartridge (optional)" on page 80).
connectors for the ultrapure cartridge.When you hear an
audible click you can be sure that the quick-connectors have
been inserted correctly.
and center on in the tube jumper. When you hear an audible
click here you can be sure that the quick-action fasteners
have been inserted correctly.
Figure
a.)
Quick-connectors
Quick-connectors adapter for
disinfection
b.)
Quick-connectors
Tube jumper
Maintenance |
Chapter 13
Dionex IC Pure system | 83

Advertisement

Table of Contents
loading

Table of Contents