Cisco SCE 8000 Installation And Configuration Manual page 160

10 gbe
Hide thumbs Also See for SCE 8000:
Table of Contents

Advertisement

Installing a DC-Input Power Supply
Remove the four screws securing the terminal block cover, and slide the cover off of the terminal block.
Step 5
(See
Figure
Figure 9-5
1
4
1
2
3
4
5
6
Attach the appropriate lugs to the DC-input wires and ground wire. The wires should be sized according
Step 6
to local and national installation requirements. Use only copper wire. The maximum width of a lug is
0.600 inch (15.2 mm).
Use fine-stranded copper conductors rated for 90°C (194°F) for North American installations.
Note
The power supply terminal block lug opening width is 0.62 inch (15.8 mm). The terminal posts are
Note
centered 0.625 inches (15.88 mm) apart and are 1/4-20 threaded. We recommend that you use an
appropriately sized industry standard 2-hole, standard barrel compression lug. The power supply ground
studs, located below the terminal block, are also threaded 1/4-20 and require two 1/4-inch split-ring
washers and two 1/4-20 hex nuts.
Cisco SCE8000 GBE Installation and Configuration Guide
9-10
9-5.)
DC-Input Front Panel for 2700-W DC-Input Power Supply
P W R - 2
7 0 0 - D C
/4
-V E -1
-V E -1
-V E -2
-V E -2
6
5
Captive installation
screw
DC power cable
terminal block
Status LEDs
DC power cable
terminal block cover
Cable holder cover
Ground
Chapter 9 Removal and Replacement Procedures
2
3
IN P U T1
IN P U T2
O K
FA N
O U TP U
48 V- 60
O K
V
O K
48 V- 60
FA IL
=4 0A
V
=4 0A
A LL FA
S TE N E
P R IO R
R S M U
TO O P
S T B E
E R A TI
FU LL Y
N G TH
E N G A
E P O W
G E D
E R S U
P P LY
8
9
7
10
7
8
9
10
11
T
11
Cable holder cover
Cable holder
Tie-wrap
Cable holder
Tie-wrap

Advertisement

Table of Contents
loading

Table of Contents