Cisco SCE 8000 Installation And Configuration Manual page 80

10 gbe
Hide thumbs Also See for SCE 8000:
Table of Contents

Advertisement

Installing the Chassis in the Rack
Align the mounting holes in the bracket (and optional cable guide) with the mounting holes in the
Step 2
equipment rack. (See
Step 3
Use a tape measure and level to choose and mark the position that the chassis is to be installed in the
rack. Make a mark at equal height on both sides of the rack. This helps ensure that the chassis is installed
straight and level.
Figure 4-14
Step 4
Install the eight (four per side) 12-24 x 3/4-inch or 10-32 x 3/4-inch screws through the holes in the
bracket and into the threaded holes in the equipment rack posts.
Step 5
Use a tape measure and level to verify that the chassis is installed straight and level.
Cisco SCE8000 GBE Installation and Configuration Guide
4-18
Figure
4-14.)
Installing the Cisco SCE 8000 Chassis in the Rack
FA N ST
SCE 8000
-SCM -E
AT US
SC M
1
OPT ICAL
BYP ASS
CON SOL
E
POR T 1
10 100
STA TUS
LINK
1000
OPT ICA
ACTI VE
L BYP ASS
SCE 8000
-SCM -E
SC M
2
OPT ICAL
BYP ASS
CON SOL
E
POR T 1
10 100
STA TUS
LINK
1000
OPT ICA
ACTI VE
L BYP ASS
SCE 8000
-SIP
SIP
3
SPA- 1X10
GE-L -V2
SPA- 1X10
GE-L -V2
4
TX
SC E8 00
TX
0- FA N
TX
A C
RX
TX
CTR L
B
RX
D
A B
RX
C
RX
D
STA TUS
OP TIC AL
BY PA SS
OP B-S
1
CE 8K -M
M
Chapter 4 Installing the Cisco SCE 8000 Chassis
SCE8 000
EXTE NDED
SERV ICE
CONT ROL
MOD ULE
MA STE R
SYS TEM
POW ER
SCE8 000
EXTE NDED
SERV ICE
CONT ROL
MOD ULE
MA STE R
SYS TEM
POW ER
SPA- 1X10
GE-L -V2
SPA- 1X10
GE-L -V2

Advertisement

Table of Contents
loading

Table of Contents