GE akta start Maintenance Manual page 79

Hide thumbs Also See for akta start:
Table of Contents

Advertisement

Step
3
4
5
6
ÄKTA start Maintenance Manual 29-0603-08 AC
Action
Use the up/down arrows to set the desired Flow Rate.
Tap Start flow to start the Pump.
Collect water for at least one minute in the pre-weighed collection tube.
Tap Stop flow to turn the Pump OFF.
Note the volume of the collected water (weigh the pre-weighed collection
tube containing the collected water and calculate the volume of the
pumped water) and then set the Collected Volume value equal to this
volume.
Tap Calibrate.
Result: The following screen opens.
Wait while the calibration is running. The calibration is done when the Cali-
bration screen re-opens.
5 Service and settings
5.5 Pump
5.5.2 Calibration
79

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents