Power Control - NEC express5800 A2010b User Manual

Hide thumbs Also See for express5800 A2010b:
Table of Contents

Advertisement

Chapter 3 Setup
9.2

Power Control

You can perform power control of the server as follows.
Power ON
Power OFF immediate
Soft Shutdown
Hard Reset
Force Dump
Power Cycle
Important
Tips
448
Performing these operations while the operating system is running may cause
the loss of data in the server.
Specify the IP address of EXPRESSSCOPE Engine SP3 on master BMC for
"IP_ADDRESS", and login user name and login password
for "USERNAME/PASSWORD" in the example.
Specify http or https for "PROTOCOL" in the example.
Do not perform any operation on WS-Management while any of the following is
running on Web console.
Tab
Remote
Access
Configuration
Update
To perform power control with WS-Management, an Operator privilege or an Administrator
privilege is required.
Express5800/A1040b, A2040b, A2020b, A2010b User's Guide
Menu screen
Power Control
All buttons
System Operation
All buttons
IPv4 Property (Master)
[Apply] button on Edit screen
IPv6 Property (Master)
[Apply] button on Edit screen
Service (Master)
[Apply] button on Edit screen
Backup / Restore
[Backup], [Restore]
BMC
[Update]
BIOS
Hardware Log
[Download BMC Dump]
Device Online / Offline
[Apply] button on Edit screen
Diagnosis
[Execute]
9. WS-Management
Buttons on dialog

Advertisement

Table of Contents
loading

This manual is also suitable for:

Express5800 a1040bExpress5800 a2020bExpress5800 a2040b

Table of Contents