Installation And Connection; Installation; Installing Rack - NEC express5800 A2010b User Manual

Hide thumbs Also See for express5800 A2010b:
Table of Contents

Advertisement

Chapter 2 Preparations
2.

Installation and Connection

This section describes how to install the server and connect peripheral devices.
2.1

Installation

This server must be mounted on a rack that conforms to EIA standards for use.

2.1.1 Installing Rack

Refer to the manual that comes with your rack for how to install the rack, or consult with your sales
representative.
Be sure to observe the following precautions to use the server safety. Failure to
observe the precautions may cause death or serious injury. For details, refer to
Safety precautions in Precautions for Use.
• Use only in the specified environment.
• Do not connect the ground wire to a gas pipe.
Be sure to observe the following precautions to use the server safely. Failure to
observe the precautions may cause burns, injury, and property damage. For
details, refer to Safety precautions in Precautions for Use.
• Do not carry or install the server only by a single person.
• Do not install the server so that the load may be concentrated on a specific
point.
• Do not install any components only by a single person. Confirm that hinge
pins of the door are completely secured in place.
• Do not pull out the server from the rack when the rack is unstable.
• Do not leave more than one device being pulled out from the rack.
• Do not provide the wiring for the server to exceed the rating of the power
supply.
• Do not use in the environment where corrosive gas is generated.
Express5800/A1040b, A2040b, A2020b, A2010b User's Guide
2. Installation and Connection
WARNING
CAUTION
209

Advertisement

Table of Contents
loading

This manual is also suitable for:

Express5800 a1040bExpress5800 a2020bExpress5800 a2040b

Table of Contents