NEC express5800 A2010b User Manual page 186

Hide thumbs Also See for express5800 A2010b:
Table of Contents

Advertisement

Chapter 2 Preparations
(4)
Installing the server in rack
1. Unlock the inner rails at both sides of server, and push the server into depths of rack.
2. Tighten the two screws that were loosened in Step 4 in (Pulling Out Server from Rack).
3. Cancel the maintenance mode. (See Chapter 3 (7.7.1 BMC – (7) Extended Functionality) for how to
cancel the maintenance mode. If the UID LED is on, turn off the UID LED using UID switch.
186
Express5800/A1040b, A2040b, A2020b, A2010b User's Guide
1. Installing / Removing Internal Options

Advertisement

Table of Contents
loading

This manual is also suitable for:

Express5800 a1040bExpress5800 a2020bExpress5800 a2040b

Table of Contents