NEC express5800 A2010b User Manual page 139

Hide thumbs Also See for express5800 A2010b:
Table of Contents

Advertisement

Chapter 1 General Description
(1) (2)
On (green)
Blinking (green)
On (amber)
Blinking (amber)
Off
(3)
On (blue) or blinking (blue)
Off
(4) (6) (8) (10)
On (green)
Blinking (green)
Off
(5) (7) (9) (11)
On (yellow)
On (green)
Off
Supplementary note
LINK/ACT LED (
LINK/ACT LED indicates the status of LAN port. This LED lights in green (LINK) while electrical power is
supplied to the server and HUB and they are connected normally. This blinks in green (ACT) while the
network port is transmitting/receiving.
Check the network cable status and cable connection status if the LED does not light even in the LINK
state. The network (LAN) controller may have failed if the LED does not still light. Contact your service
representative.
SPEED LED (
1,
This LED indicates which of network interfaces is used for the network port.
Lighting in yellow indicates that network port is operating at 1000Mbps. Lighting in green indicates that
network port is operating at 100Mbps. When network port is operating at 10Mbps, this LED is off.
Explanation
1,
2,
M1,
M2)
: (4), (6), (8), (10)
2,
M1,
M2)
: (5), (7), (9), (11)
Express5800/A1040b, A2040b, A2020b, A2010b User's Guide
5. Names and Functions of Components
Solution
MGB is operating normally.
MGB is operating normally, and BMCFW is being booted, or being
shutdown.
MGB is failed.
MGB is failed, and BMCFW is being booted, or being shutdown.
MGB is in halt state.
The UID switch is pressed.
The UID switch is not pressed.
The port is connected with network normally.
The port is accessing the network.
The port is disconnected from network.
The port is operating with 1000BASE-T.
The port is operating with 100BASE-TX.
The port is operating with 10BASE-T.
139

Advertisement

Table of Contents
loading

This manual is also suitable for:

Express5800 a1040bExpress5800 a2020bExpress5800 a2040b

Table of Contents