Polaris 2013 RANGER RZR S Service Manual page 369

Hide thumbs Also See for 2013 RANGER RZR S:
Table of Contents

Advertisement

2. Install brake line banjo bolt and torque to specification.
3. Install the pad adjustment screw and turn until
stationary pad contacts disc, then back off 1/2 turn.
4. Follow bleeding procedure outlined earlier in this
chapter.
5. Install wheel and torque wheel nuts to specification.
Wheel Nuts:
Steel Wheels: 27 ft-lbs (37 Nm)
Aluminum Wheels: 30 ft-lbs + 90° (1/4 turn)
NOTE: If new pads are installed, refer to "REAR
BRAKE PADS - Brake Burnishing Procedure".
15 ft-lbs
(21 Nm)
= T
9924125 - 2013 RANGER RZR / RZR S / RZR 4 Service Manual
© Copyright 2012 Polaris Sales Inc.
BRAKES
9
9.23

Advertisement

Table of Contents
loading

This manual is also suitable for:

2013 ranger rzr 4

Table of Contents