Polaris 2013 RANGER RZR S Service Manual page 273

Hide thumbs Also See for 2013 RANGER RZR S:
Table of Contents

Advertisement

6. Install brake caliper and mounting bolts. Torque bolts
to specification.
Front Caliper Mounting Bolts:
31-34 ft-lbs (42-46 Nm)
CAUTION
New bolts have a pre-applied locking agent
which is destroyed upon removal. Always use
new brake caliper mounting bolts
upon assembly.
7. Install the steering tie rod end onto the front bearing
carrier.
NOTE: Refer to the photos below to ensure proper
placement of the tie rod end.
42.5 ft-lbs
58 (Nm)
RZR / RZR S
Shown
42.5 ft-lbs
58 (Nm)
RZR 4
Shown
= T
Tie Rod End
Tie Rod End
9924125 - 2013 RANGER RZR / RZR S / RZR 4 Service Manual
© Copyright 2012 Polaris Sales Inc.
8. Torque the tie rod end fastener to specification and
install a new cotter pin.
Tie Rod End Fastener:
42.5 ft-lbs (58 Nm)
9. Torque wheel hub nut to specification and install a
new cotter pin. Tighten nut slightly if necessary to
align cotter pin holes.
80 ft-lbs
(108 Nm)
Wheel Hub Castle Nut:
80 ft-lbs (108 Nm)
10. Install wheel and (4) wheel nuts. Torque wheel nuts
to specification.
Wheel Nuts:
Steel Wheels: 27 ft-lbs (37 Nm)
Aluminum Wheels: 30 ft-lbs + 90° (1/4 turn)
11. Rotate wheel and check for smooth operation. Bend
both ends of cotter pin around end of spindle in
different directions.
FINAL DRIVE
= T
NEW Cotter Pin
= T
= T
7.5
7

Advertisement

Table of Contents
loading

This manual is also suitable for:

2013 ranger rzr 4

Table of Contents