System Functioning Check; Motor Oil System - MV Agusta Rivale 800 Workshop Manual

Hide thumbs Also See for Rivale 800:
Table of Contents

Advertisement

SYSTEM FUNCTIONING CHECK

Assemble the following components in order:
• Airbox.
• Fuel tank.
• Rear side panels (n°2 items for each side).
• Radiator side panels.
• Air intake ducts.
• Air outlet side panels.
• Saddle.
For the assembly operations, assemble in reverse
order of removal.
Cooling system
Insert the ignition key and start up the vehicle engine.
Keep it running until it warms up and wait until fan enter
into operation at least twice. Switch off the engine and
wait for the temperature to cool down. Then do a final
check of the cooling liquid level and top up if neces-
sary.
Carefully check that there is no leakage from the cool-
ing system or.

Motor oil system

Start the engine for some minutes.
L
After having shut off the engine, wait for at least 10
minutes and check the oil level. Ensure that the ground
is flat and keep the motorcycle standing as much as
possible.
The level must be near the "MAX" reference on the tim-
ing case as much as possible. Do not exceed this limit.
Check any oil leakages.
Avoid making the engine turn with the oil
level lower than the minimum level; this can
impair the operation of the different parts of
the engine.
If the oil level, after the reset, is upper than
the "MAX" reference, correct it by emptying
the system.
Complete the assembly of the motorcycle.
Cooling system
- 38 -