Superstructures
Remove the six screws (16) with rear indicators fixing
washer.
16
C
Cut the band fastener (17) joining the electric cables.
17
At this point, the indicators will be as in the figure (com-
plete with spacers and rubber pads).
To re-assemble the unit, proceed in reverse order, fol-
lowing the layout (given below), which indicates the
correct tightening torques and fixing where the thread-
locker is to be applied.
- 40 -