Buell 2003XB9S Service Manual page 369

Hide thumbs Also See for 2003XB9S:
Table of Contents

Advertisement

HOME
Code 16 Test (Part 1 of 2)
1
4-60
2003 Buell XB9S: Fuel System
Perform charging system tests.
See
7.6 CHARGING SYSTEM
Charging system OK?
YES
Remove spark plug cables from spark plugs.
Attach Breakout Box (HD-42682) to ECM.
Measure voltage at ECM Pin 1 (+) and
Pin 11 (-) of [10] on Breakout Box while cranking
engine. Disregard voltage during first two seconds
of cranking. Is voltage above 6.2 volts?
YES
System
OK.
7770
YES
Measure voltage drop between Battery
Positive Terminal (+) and Terminal 87 on
ignition relay with key ON.
Is voltage drop greater than 0.5 volt?
YES
Measure voltage drop between Battery
Positive Terminal (+) and GY/O Terminal 30
on ignition relay with key ON.
Is voltage drop greater than 0.5 volt?
YES
STOP
Go to
Code 16 Test
(Part 2 of 2).
NO
Repair charging
system.
NO
Measure voltage drop between Battery
2
Positive Terminal (+) and ECM Pin 1 of [10]
on Breakout Box with key ON.
Is voltage drop greater than 0.5 volt?
NO
Check for excessive starter cur-
rent draw. See
5.6 STARTER
SYSTEM
TESTING.
NO
Repair GY wire
or terminals.
7766
NO
Replace ignition
relay.
7767
Clear codes and confirm proper operation with no
check engine lamp. Codes can be cleared using
DIGITAL TECHNICIAN (Part No. HD-44750).
7768

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents