Buell 2003XB9S Service Manual page 238

Hide thumbs Also See for 2003XB9S:
Table of Contents

Advertisement

HOME
8765
1.
5/16 - 3/8 in. (8-9.53mm)
21. See
Figure 3-49.
Install the return, feed and vent oil lines
starting at the swingarm/oil reservoir and working
towards the front of the vehicle. Leave all oil line fittings
loose at this time.
NOTE
Once the three main oil lines are attached, it will be neces-
sary to follow the proper torquing sequence. The three main
oil lines must be torqued at the swingarm/oil reservoir first.
22. See
Figure 3-49.
Torque the return oil line first making
sure to maintain the proper clearance between the oil
line and the rear muffler bracket. 19-21 ft-lbs (25.8-28.5
Nm.)
Return.
Feed
2
1
2.
37/64 - 45/64 in. (14.68-17.86mm)
Figure 3-49. Oil Line Clearances and Torques
23. Torque the feed oil line next making sure the distance
24. Torque the vent oil line next making sure the distance
Vent
3
3.
1/4 - 23/64 in. (6mm - 9.13mm)
between the feed line and the return line is within specifi-
cations. 20-22 ft-lbs (27.1-29.8 Nm).
between the vent line and the feed line is within specifi-
cations. 14-16 ft-lbs (19-21.7 Nm).
2003 Buell XB9S: Engine
3-35

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents