Installing Summit Family Switches
Installing a Summit X670 Series Switch
The Summit X670 series switch fits into a standard 19-inch equipment rack. The provided
rack-mounting brackets attach to the front of the switch unit and are adaptable to either a
front-mount or mid-mount installation.
The installation process includes the following tasks:
1 Install the switch in the rack.
2 Ground the switch.
3 Install the first power supply.
4 (Optional) Install a second power supply.
5 (Optional for Summit X670V-48x switch) Install a VIM4-40G4X module.
6 Connect power cables.
7 For a stacked configuration, connect stacking cables.
8 Connect network interface cables.
If you are installing Summit X670 series switches for use in a SummitStack configuration, read
5, "Building a SummitStack Configuration,"
NOTE
Take care to load the rack so that it is not top-heavy. Start installing equipment at the bottom of the
rack and work up.
Pre-installation Requirements
Installing the Summit X670 series switch requires two people to maneuver the switch and attach
mounting hardware.
Make sure there is adequate space behind the rack to provide access for installing power supplies and
port option cards or modules.
The following items are provided with the Summit X670 series switch:
Two rack mounting brackets adaptable for either a front-mount or mid-mount installation
●
Twelve screws for attaching the brackets to the switch enclosure
●
Ring terminal (equivalent to Panduit PV14-8R-E) and M4 screw with captive washer for grounding
●
the switch
You need the following additional tools and equipment:
#1 Phillips screwdriver
●
Four rack mounting screws
●
The screw size will vary based on your organization's rack system; screws are not provided.
Screwdriver for securing the switch to your organization's rack
●
The screwdriver size will vary based on the requirements of your organization's rack system.
AC power cord for each installed AC power supply
●
An AC power cord is not included with the Summit X460 series switch. You must obtain a power
supply cord that meets the requirements listed under
234
before you install the switches.
"Selecting Power Supply Cords" on page
Summit Family Switches Hardware Installation Guide
Chapter
333.