Extreme Networks Summit X150 Series Hardware Installation Manual page 263

Summit family
Hide thumbs Also See for Summit X150 Series:
Table of Contents

Advertisement

Figure 215: Connecting an EPS-150DC Unit to a Switch
Extreme switch
EPS-150DC
Redundant
power cord
7 Energize the DC circuit.
The Power LED on the front of the EPS-150DC unit turns solid green to indicate that it is ready.
Summit Family Switches Hardware Installation Guide
Installing an EPS-150DC External Power Module (with EPS-T2)
Keyed end of
redundant
power cord
Slot for key
DC wiring
harness
-48 V
2 . 0 A M a x
To DC Power
Source
To DC
Power
DC wiring
Source
harness
EPS-150DC_002B
263

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents