17.6 Main Module
Preparation
Remove battery boxes. See chapter 12.1 in this respect.
Remove splash protection. See chapter 11.7 in this repsct.
Remove cable binders located at the main module.
Removing the Main Module
Remove all plugs from the socket board of the main module.
NOTE:
Press down plug lock, as otherwise the plugs will be
damaged.
Loosen the two fastening screws of the main module
(SW 8 mm).
Pull module out of the battery box retainer in downward direction.
Installing the Main Module:
Push the main module into the battery box retainer from below und
and fasten it by means of the two screws.
Insert the plugs into the modules socket board .
The arrangement of the plugs can be seen from the connecting
plan.
Attach new cable binders.
Mount the splash protection.
Insert the battery boxes.
Connecting Plan: Main Module
linker Fahrmotor
left driving motor
M 2
Batterie
ACS-Fahrpult
Battery
ACS-Remote
+
+
1
D
+
X
B
U
S
24V
zu weiteren Modulen
rechter Fahrmotor
right driving motor
M 1
2
Location of the cable binders
Removing the main module
Fastening screw
M5 x 20 - SW 8
Detail: Module Fastening
Washer
Nut M5 - SW 8,
Washer
self-locking
Screw
M5 x 20 - SW 8
Cable
binders
101