88 Chapter 8 Replacing basic chassis components
14
15
16
17
18
19
Replacing the cooling fan
The cooling fan is hot-swappable, so you can replace the cooling fan without
powering down the server.
When to hot-swap the cooling fan
When the LED associated with a cooling fan turns red, the fan requires
replacement.
Copyright © 2007, Nortel Networks
.
Replace the original SCSI power cable with the new cable. Securely
attach it to both the SCA backplane and the T board inside the
chassis.
Reinstall the SCSI drive cage into the bay and screw it into place.
Torque the screws at 6 to 8 inch lbs.
Affix a revised product label above the existing labels on the left
rear of the chassis.
Product label location on chassis
Replace the bezel cover on the front of the chassis.
Reconnect the AC or DC mains power.
Reboot the CallPilot server and bring it into full service.
Nortel CallPilot
1002rp Server Maintenance and Diagnostics
NN44200-701 01.02 Standard
5.0 4 April 2007
—End—
Nortel Networks Confidential