Skoda Octavia III 2013 Workshop Manual page 181

Hide thumbs Also See for Octavia III 2013:
Table of Contents

Advertisement

– If the fuse holder and relay holder are fully removed, loosen
nuts -1, 2, 4, 5, 6- and screw out screw -3- and loosen electrical
cables -arrow-.
Note
Mark screw connections for re-installation of the electric cables.
– Unscrew the nuts -arrows- (9 Nm) and remove control unit
holder -1-.
– Loosen E-Box housing -2- from the catch -3- and remove it
upwards from the threaded bolts.
Installing
Installation is carried out in the reverse order. When installing,
observe the following:
Tightening torques for connection cables:
♦ M6 – tightening torque 6 Nm
♦ M5 – tightening torque 4.5 Nm
– Pay attention to the work sequence when connecting the bat‐
tery
⇒ "2.3 Work sequence when disconnecting and connecting
the battery", page 2
.
Octavia III 2013 ➤ , Octavia III 2014 ➤
Electrical system - Edition 12.2014
1. Fuse holder and relay carrier
173

Advertisement

Table of Contents
loading

This manual is also suitable for:

Octavia iii 2014

Table of Contents