Phase 2 Hardware Addition/Replacement; Verify Translation Timestamp - Avaya DEFINITY Server R Manual

Upgrades and additions
Hide thumbs Also See for DEFINITY Server R:
Table of Contents

Advertisement

Phase 2 Hardware Addition/Replacement

Verify Translation Timestamp

NOTE:
Ignore the System Configuration field data for now. The screen may
show incorrect system configuration data.
If standard reliability:
1. Type list configuration software-version and press
translations show the current timestamp.
If high or critical reliability:
1. Type list configuration software-version long and press
that the translations show the current timestamp.
Phase 2 Hardware
Addition/Replacement
In this second phase you will add memory and replace the DUPINT circuit packs.
At the end you will remove/unseat the disk drive and reboot the system from the
optical drive to complete the upgrade.
1. Add the 3rd (if necessary) and 4th TN1650B Memory circuit pack
2. Replace the UN330B DUPINT circuit packs if not Vintage 3 or later
3. Replace the TN1657 Disk Drive if not Vintage 9 or later.
4. You must back it out about an inch so the system can boot from the
removable media.
Insert Removable Media
1. Place the removable media containing the new software load, label facing
left, into the optical drive. The arrow should be in the top left position when
inserting the cartridge into the drive.
555-233-115
NOTE:
Make sure the removable media is not write protected before placing
it into the optical drive. If you can see through the hole, it is write
protected.
to verify that the
Enter
to verify
Enter
Issue 5 October 2002
2-33

Advertisement

Table of Contents
loading

Table of Contents